Decoration wall glass installation technology process technology

[China Glass Network] 1. Installation process sequence:

Base treatment → standing ribs → paving lining → wall glass installation.

2, the base layer treatment in the construction of walls or columns, to embed wooden bricks in the wall, the horizontal and glass width is equal, vertical and glass height is equal, large-area glass installation should also be horizontal and vertical every 500mm buried wood bricks. The wall should be plastered. According to the different parts of use, hot asphalt or linoleum should be applied on the plastering surface. The linoleum can also be sandwiched between the wood lining and the glass. The main purpose of these practices is to prevent moisture from making wood. The lining is deformed to prevent the back paint from falling off due to moisture.

3. The studs of the ribs are 40×40 or 50×50 small wooden squares, which are nailed to the wooden bricks. The installation of small pieces of glass is mostly two-way standing ribs. The installation of large pieces of glass can be used for one-way standing ribs, and the positions of horizontal and vertical wall ribs are consistent with the wooden bricks. It is required that the vertical ribs are horizontal and vertical to facilitate the fixing of the lining and the glass. Therefore, it is necessary to hang the horizontal vertical line when standing the ribs. Before installation, check whether the moisture-proof layer is good. After the ribs are nailed, check the flatness with a long rule.

4. The lining plate of the lining is 15mm thick wood or 5mm thick plywood. It is connected with the wall ribs with small nails, and the nail head is not into the board. The size of the lining plate can be larger than the spacing of the ribs, which can reduce the cutting process and increase the construction speed. The surface of the lining plate is required to be free from warping and peeling, and the surface is smooth and clean, and the gap between the plate and the plate should be at the standing rib.

5, glass installation fixed glass installation construction, including: 1 glass cutting; 2 glass drilling; 3 glass fixed. When the glass is installed, the fixing method usually has five ways of fixing the screw, fixing the nail, fixing the bonding, fixing the pressing, and fixing the fixing.

1 Screw fixing: Open screw fixing method, suitable for glass below 1m2. When the wall surface is a concrete base, the wooden bricks are inserted in advance, the anchor plugs are buried, or the wooden wall bars are placed on the wooden bricks and the anchor plugs. Then use Φ3~Φ5 flat head or round head screw to penetrate the wall rib through the hole on the glass to fix the glass.

2 Stud fixing: Stud fixing is a fixing method of nailing the studs on the wall bars and pressing the four corners of the glass.

3 Bonding and fixing: Bonding and fixing is a fixing method for bonding glass with epoxy resin or glass glue to wood lining, and is suitable for glass of 1 m2 or less. When using glass decoration on the column, it is more convenient to use this method.

4 support pressure fixed: the support pressure is mainly pressed against the wall by the pressure of the pressure strip and the frame support. The bead and frame are available in wood, plastic and metal profiles (if there are aluminium profiles specifically for glass mounting). It is also possible to use a method of supporting hardware, which can be applied to a glass of about 2 m2. The glass is opened up and down, because it is supported by hardware, so it is a safer method.

5 Bonding support fixing: In addition, for a large area of ​​monolithic glass, the main method is to support the pressing method, and it can also be fixed by bonding method. The mass load of the glass itself mainly falls on the lower frame or the masonry, and the other frames prevent the glass from being cambered and decorated. For continuous wall-mounted assembly and ceiling glass bonding, the method of bonding the supporting hardware should also be used. This method is suitable for wall surface, 3m2; for ceiling, below 60cm2. On the basis of confirming that the smoothness, strength and dryness of the substrate meet the requirements, the hardware is attached, and the glass layer is coated with a glass adhesive and a block (wood or rubber block) to press the glass. After adjusting the hardware, fill the seal in the seam.